Summery
98/2 FPSO (Floating Production Storage and Offloading) is part of ONGC’s Cluster 2 development in the KG-DWN-98/2 block, located offshore in the Krishna-Godavari Basin, India. The project involves the EPC (Engineering, Procurement, and Integration) of an FPSO designed for oil and gas processing, separation, storage, and export. Key features include processing facilities for crude oil, gas dehydration, water treatment, and offloading systems, ensuring efficient offshore production while meeting environmental and operational standards.
Scope
- Period (year) – 2022
- Client – ONGC
- Location (country) – Singapore
- Type of Project – EPC
- Type of Project – OFFSHORE
- Contract Type – Lump Sum
- Developed activities – Preparation of various Operation Manuals
- No of engineering man-hours – 4320
- Disciplines involved – Mechanical, Electrical, Instrumentation, Telecom, Piping & Process
- MAIN software – NA
- Externalized engineering activities – NA
- Main Equipment – NA
- Other note – Company – ONGC, Main contractor – Shapoorji, Subcontractor – Kavin Engg. Our services were oferred to Kavin for this project
Gallery